Substation Transformer Remanufacturing Success Stories
Reviving Excellence
See how remanufacturing their substation transformers helped these utilities upgrade, resolve issues, and get back up-and-running in half the time an OEM could deliver.
![IOU 5-2-1 IOU 5-2-1](https://jordantransformer.com/hs-fs/hubfs/images/on-page/Case%20Study%20Imgs/IOU%205-2-1.jpeg?width=1200&height=749&name=IOU%205-2-1.jpeg)
CASE STUDY
Substation Transformer Voltage Composition Change
Read how Jordan Transformer remanufactured a substation transformer by providing the same advanced functionality of new equipment in the more robust structure of the original unit.
![Fire 6.2 Fire 6.2](https://jordantransformer.com/hs-fs/hubfs/images/on-page/Case%20Study%20Imgs/Fire%206.2.jpg?width=1200&height=749&name=Fire%206.2.jpg)
CASE STUDY
Reconditioning After
Fire Damage Brings
Transformer Back to Life
Internal wear and tear caused a bushing to explode and catch fire on a 24/32/40 MVA 138—13.8Y ASEA transformer with LTC. Read how remanufacturing provided the solution.
![After Coils-1 After Coils-1](https://jordantransformer.com/hs-fs/hubfs/images/on-page/Case%20Study%20Imgs/After%20Coils-1.jpeg?width=1200&height=749&name=After%20Coils-1.jpeg)
CASE STUDY
Coil Failure Creates
Opportunity to
Increase Capacity
Smaller electric co-ops sometimes have difficulty purchasing new transformers at a price they can afford. Read how one co-op remanufactured their transformer as a solution.