Find Your Shorter Lead Time with a Remanufactured Transformer

        You can’t wait years for a new power transformer. There is a better option.

        Jordan Transformer can remanufacture your transformers by reusing their strong steel tanks, cores, and other components. Only upgrade what you need to. A short lead time, cost savings, and reliable performance. Transformer remanufacturing is the solution that many communities need right now.

        We remanufacture oil filled power transformers and mobile substations ranging from 10 MVA - 80 MVA with voltages up to 230kV. Put simply, your transformer can be hauled to a special facility for disassembly, rewinding, reassembly, testing, and re-installation just 12 months after the scope of work was established. Reviving a transformer to fit back in its existing spot means you save design engineering time on the front end and substation retrofitting on the back end.

        JT0060122 BEFORE-AFTER 5

         


        What situation are you facing?

        Is remanufacturing possible for you? Let’s connect, and we’ll talk about:

        • Timing: What timeline are you facing? Learn about our process and if it fits your needs.
        • Funding: Capital expenditures vs. Maintenance budgets?
        • Approval Process: What is the approval process you have to work with?
        • Transformer Nameplate Basics: Original manufacturer, MVA, voltage class, core and coil weight, total weight, LTC Y/N, location of transformer
        • Failure Mode: Gas failure or functional failure
        • Transformer Location and is it in service now?

        Let's Talk Lead Times: